Projects In Design
PTH1/1A Portage La Prairie West Bypass Project
Summer 2023
Assiniboine River Bridge on PTH 5
Summer 2022
Red River Bridge on PR 305
Spring 2021
- Red River Bridge on PR 305 Virtual Open House Spring 2021 (PDF)
- Red River Bridge on PR 305 What We Heard Report (PDF)
Red River Floodway Bridge on PTH 59
Fall 2022
Fall 2021
Summer 2021
Fall 2020
Spring 2019
- Red River Floodway Bridge at PTH 59N Newsletter Spring 2019 (PDF, 850 KB)
- Red River Floodway Bridge at PTH 59N Open House Boards May 22 2019 (PDF, 4 MB)
PTH 1 and 1A Interchange Study
Summer 2021
- PTH 1 and 1A Interchange Study August 2021 (PDF, 4.3 MB)
Winter 2020
- PTH 1 and 1A Interchange Study February 2020 (PDF, 2.8 MB)
- PTH 1 and 1A Open House Boards February 2020 (PDF, 3.4 MB)
Grassmere Creek on PTH 9
Summer 2019
- Grassmere Creek on PTH 9 Newsletter Summer 2019 (PDF, 1630 KB) (This publication is available in alternate format upon request.)
Assiniboine River at St. Francois Xavier Bridge on PTH 1W
Fall 2017
Winnipeg River Bridge on PR 313
The materials presented during the public information sessions are now appended to the Public Consultation Report
Summer 2019
- PR 313 Newsletter Summer 2019 (PDF, 931 KB)
Fall 2018
- PR 313 Newsletter Fall 2018 (PDF, 581 KB)
Spring 2018
- PR 313 Newsletter Spring 2018 (PDF, 586 KB)
Summer 2017
- PR 313 Newsletter Summer 2017 (PDF, 560 KB)
Summer 2016
- PR 313 Newsletter Summer 2016 (PDF, 644 KB)
Spring 2015
- PR 313 Newsletter Spring 2015 (PDF, 485 KB)
December 2014
- Public Consultation Report (PDF, 8.2 MB)
Engineering Service Provider Agreements
- Engineering Service Provider Agreement for Fees Based Contracts (Word, 50 KB)
- Engineering Service Provider Agreement for Lump Sum Based Contracts (Word, 45 KB)
Procedures
Engineering Service Provider Registry
- Categories of Work (PDF,400 KB)
- Procurement (PDF,260 KB)