Information on Construction
What We Do:
Current Construction Projects
- Burntwood River Bridge PR 391 Thompson (PDF, 839 KB)
- Winter 2023 Newsletter (PDF, 1.09 MB)
- Daly Overpass Project (PTH 10 - Brandon)
- PR313 Winnipeg River Bridge (PDF, 500 KB)
- Grassmere Creek on PTH 9 (PDF, 1.3 MB)
Red River Floodway Bridge on PTH 59
Fall 2022
Fall 2021
Summer 2021
Fall 2020
Spring 2019
- Red River Floodway Bridge at PTH 59N Newsletter Spring 2019 (PDF, 850 KB)
- Red River Floodway Bridge at PTH 59N Open House Boards May 22 2019 (PDF, 4 MB)
PR 313 Winnipeg River Bridge
Construction Requires Temporary Full Closure of PR 313 Bridge Over Winnipeg River at Lac Du Bonnet Nov. 24 to Dec. 15, 2018
Manitoba Infrastructure advises the PR 313 bridge over the Winnipeg River at Lac du Bonnet will be closed to all traffic for construction needs from Nov. 24 to Dec. 15.
It will be necessary to completely close the bridge for about three weeks to replace the navigation span in the middle of the bridge which allows boat traffic to cross underneath. The full closure is being done at this time of the year as it will have the least impact based on feedback from public and stakeholder sessions.
A detour route follows PTH 11, PR 211 and PR 520. Signage and variable message boards will be in place to direct traffic. After the full closure, traffic will continue to operate as a single lane controlled with traffic signals. Project completion is scheduled for December 2019.
The original bridge was constructed in 1908 as a wooden rail bridge for the Winnipeg Hydro Tramway. In 1931, it was replaced with a steel bridge which highway traffic was able to use. The bridge deck was later raised to accommodate rising water levels created by the construction of the McArthur Falls Generating Station. In 1963, the rail tracks were removed.
PR 313 Detour Map (PDF, 442 KB)
PTH 59 and PTH 101 Interchange
- North Perimeter 101 and Highway 59 Detour # 1 (PDF, 757 KB)
- North Perimeter 101 and Highway 59 Detour # 2 (PDF, 1 MB)
Province Announces Construction Begins on New Interchange at Intersection of PTH 59 and PTH 101
- PTH 59 Design Build Project Announcement Fact Sheet (PDF, 274 KB)
- PTH 59N and 101 Future Interchange (PDF, 222 KB)
- PTH 59N and PTH 101 Interchange Functional Design Study
For information on tenders pertaining to construction projects, visit construction tenders.
Visit Manitoba 511 - Road and Traveller Information for highway conditions and construction zone updates.
Manitoba Infrastructure Fact Sheet - PTH 23 Red River Bridge (PDF, 519 KB)