Index for Standard Construction Specifications |
Number |
Date |
Pages |
|
Index for Comb Book |
|
May 2022 |
4 |
Bidding Procedures |
90 |
July 2020 |
15 |
General Conditions |
100(I) |
March 2020 |
24 |
Specifications for Quality Control |
110(I) |
March 2020 |
6 |
Specifications for Surveying |
120(I) |
March 2020 |
4 |
Liquidated Damages |
130(I) |
February 2017 |
9 |
Interim Payments |
140(I) |
February 2017 |
2 |
Fuel Cost Adjustments |
160 |
April 2022 |
6 |
Weigh Scales |
170 |
May 2012 |
4 |
Field Laboratories |
180(I) |
August 2015 |
5 |
Mobilization of Equipment |
190(I) |
July 2015 |
1 |
Traffic |
Traffic Control |
200 (I) |
February 2020 |
15 |
Dust Control |
220 |
June 2000 |
1 |
|
|
Clearing and Grubbing |
Clearing and Grubbing |
300 |
July 2003 |
2 |
Clearing |
310 |
March 1986 |
1 |
Grubbing |
320 |
March 1986 |
1 |
Forest Service Provisions |
330 |
April 1970 |
1 |
Removing Ornamental Trees |
340 |
April 1970 |
1 |
|
Removing Culverts and Placing Culverts |
400 |
March 2002 |
6 |
Jacking Culverts Through Embankments |
410(I) |
February 2017 |
7 |
Grading |
Grading |
500(I) |
March 2018 |
18 |
Boulevard Earth Fill |
510 |
March 1986 |
1 |
Granular Fill |
520 |
March 1986 |
1 |
Towing |
530 |
March 1986 |
1 |
Seeding |
540 |
July 2011 |
1 |
Landscaping |
550 |
July 2011 |
3 |
Gravelling |
Lease Agreement for Stockpiling Site |
-- |
-- |
2 |
Stockpiling Aggregates |
600(I) |
February 2017 |
4 |
Supplying and Depositing Aggregates |
610(I) |
February 2017 |
3 |
Base Course |
Granular Base Course |
700(I) |
February 2017 |
11 |
Construction Specification for Granular Course |
701(I) |
March 2020 |
15 |
Pavement |
Bituminous Pavement and Recycled Bituminous Pavement |
800(I) |
August 2019 |
16 |
Construction Specification for Bituminous Pavement |
801 |
March 2023 |
30 |
Applying Prime Coat & Tack Coat |
806(I) |
March 2020 |
5 |
Removing Asphalt Pavement |
810 |
March 1986 |
1 |
Reclaiming Bituminous Pavement |
815 |
May 1997 |
3 |
Cold Central Plant Recycling |
817 |
January 2022 |
12 |
Asphalt Curb |
820 |
March 1986 |
1 |
Emulsified Asphalt Chip Seals |
823 |
February 2022 |
22 |
Asphalt Surface Treatment |
825 |
March 2002 |
3 |
Micro Surfacing Treatment |
827 |
November 2022 |
16 |
Concrete Pavement |
830(I) |
February 2017 |
17 |
Crack Sealing |
840 |
January 2020 |
10 |
Concrete Curbing |
860(I) |
August 2013 |
11 |
Construction of Sidewalks |
870 |
March 1986 |
2 |
Removing Concrete Curb |
880 |
March 1986 |
1 |
Rubblization of Portland Cement Concrete |
885(I) |
August 2013 |
4 |
Removing Concrete Pavement |
890 |
March 1986 |
1 |
Shoulder and Centreline Rumble Strip |
895(I) |
August 2013 |
7 |
Aggregate |
for Granular Base Course |
900 |
April 2022 |
6 |
Material Specification for Aggregate – Granular Course |
901(I) |
March 2020 |
10 |
for Traffic Gravel |
910 |
August 2015 |
3 |
for Bituminous Pavement |
920(I) |
February 2017 |
8 |
Material Specification for Aggregate – Bituminous Pavement |
921(I) |
March 2020 |
9 |
for Portland Cement Concrete |
930(I) |
March 2015 |
5 |
for Seal Coat Cover |
940 |
August 2015 |
2 |
for Winter Sand |
950(I) |
August 2015 |
2 |
top of page
|
|
Excavation |
Structural Excvation |
1000(I) |
June 2013 |
5 |
Supplying and Placing Backfill |
1001(I) |
June 2011 |
7 |
Supplying and Placing Granular Backfill |
1002 M |
February 1982 |
1 |
Supplying Coarse Granular Backfill |
1003 M |
February 1982 |
1 |
Supplying and Placing Drainfill |
1004 M |
February 1982 |
2 |
Supplying and Placing Subsurface Drainage Fill |
1005 M |
January 1981 |
1 |
Piles |
Driving Treated Timber Piles |
1010 M |
January 1981 |
3 |
Supplying and Driving Steel Bearing Piles |
1012(I) |
March 2010 |
7 |
Supplying and Driving Steel Pipe Piles |
1014(I) |
September 2010 |
8 |
Driving Precast Concrete Piles |
1016 M |
May 1984 |
4 |
Placing Cast-In-Place Concrete Piles |
1018(I) |
August 2010 |
4 |
Demolition |
Demolition and Removal of Existing Structures |
1020(I) |
April 2013 |
4 |
Dismantling and Salvage of Existing Structures |
1021(I) |
April 2013 |
4 |
Timber |
Construction of Treated Timber Structures |
1025 M |
May 1984 |
4 |
Concrete |
Reinforced Cast-in-Place Concrete |
1030(I) |
March 2010 |
34 |
Ready-Mix Concrete |
1031 M |
January 1981 |
3 |
Superstructure Concrete |
1032(I) |
March 2010 |
16 |
Underwater Concrete |
1035 M |
May 1984 |
8 |
Supplying and Placing Concrete Reinforcement |
1038(I) |
March 2010 |
7 |
Concrete Repairs |
1039(I) |
November 2010 |
6 |
Prestressed Concrete |
Fabrication of Precast Prestressed Concrete Girders |
1040(I) |
May 2010 |
20 |
Erection of Precast Prestressed Concrete Girders |
1041(I) |
June 2011 |
7 |
Lateral Stressing, Placing of Anchor Rods and
Miscellaneous Grouting |
1042 M |
May 1984 |
5 |
Enclosing and Heating |
1043 M |
May 1984 |
3 |
Cast-In-Place Prestressed Post Tensioned Concrete |
1044 M |
January 1981 |
11 |
Fabrication of Precast Reinforced Concrete Box Culverts |
1045 M |
May 1984 |
5 |
Erection of Precast Reinforced Concrete Box Culverts |
1046 M |
May 1984 |
5 |
Fabrication of Precast Concrete Panels |
1047(I) |
May 2011 |
9 |
Installation of Precast Concrete Panels |
1048(I) |
June 2011 |
3 |
Waterproofing and Paving |
Supply and Application of Asphalt Damp Proofing |
1050(I) |
March 2010 |
2 |
Asphalt Paving on Bridges |
1052 M |
May 1984 |
8 |
Hot Poured Rubberized Asphalt Waterproofing |
1055 M |
May 1984 |
2 |
Bituminous Seal Coating of Bridges |
1056 M |
May 1984 |
4 |
Steel |
Supply, Fabrication and Delivery of Structural Steel |
1060(I) |
March 2010 |
24 |
Erection of Structural Steel |
1061(I) |
March 2010 |
8 |
Supply, Fabrication and Erection of Miscellaneous Metal |
1062(I) |
March 2010 |
13 |
Placing Steel Beam Guardrailing |
1064 M |
January 1981 |
1 |
Supply, Fabrication and Installation of Expansion Joints |
1065(I) |
March 2010 |
6 |
Painting |
Coating Structural Steel |
1070(I) |
March 2010 |
11 |
Field Painting |
1071 M |
January 1981 |
3 |
Structural Plate Pipes |
Supply and Installation of Structural Plate
Corrugated Steel Pipes |
1075 M |
May 1984 |
5 |
Supply and Installation of Extensions to
Corrugated Structural Steel Plate Pipes |
1076 M |
May 1984 |
6 |
Rip-Rap |
Fabrication and Delivery of Precast Concrete Barriers |
1080(I) |
May 2010 |
7 |
Oversized Sandbag Rip-Rap |
1081 M |
January 1981 |
2 |
Installation, Relocation and Removal of Precast Concrete Barriers |
1082(I) |
March 2010 |
2 |
Precast Concrete Rip-Rap |
1084 M |
May 1984 |
3 |
Fabrication of Precast Prestressed Concrete Deck Panels |
1085(I) |
February 2013 |
18 |
Installation of Precast Prestressed Concrete Deck Panels |
1086(I) |
February 2013 |
6 |
Bridge Miscellaneous |
Supplying and Placing Electrical and Telephone Conduit |
1090(I) |
March 2010 |
3 |
Temporary Works |
1092(I) |
March 2010 |
6 |
Site Office Trailer |
1095(I) |
March 2010 |
3 |
Concrete Slope Protection |
1096(I) |
March 2010 |
10 |
top of page
|
|
Strip Vertical Aerial Photography |
1262 |
March 1991 |
1 |
Supply and Application of Dust Control |
1280 |
February 2019 |
9 |
Supply and Delivery of Corrugated Steel Culverts |
1285 |
May 1997 |
6 |
Supply and Delivery of Precast Concrete Culverts |
1290 |
February 2001 |
8 |
Erosion Control |
Supply and Installation of Geotextile Fabric |
1295 |
June 2000 |
3 |
Supply and Place Silt Fence Barrier |
1296 |
May 2012 |
2 |
Stone Rip-Rap |
1297 |
July 2003 |
2 |
Supply and Place Erosion Control Blanket |
1298 |
February 2001 |
1 |
top of page
|