Archived Standard Construction Specifications
Starting March 2013, Infrastructure began online archiving of previous versions of the standard construction specifications below. Previous versions of a given specification can be viewed by clicking the version date in the "Date" column of the table. A black line document showing all revisions between successive versions of a specification and can be opened by clicking the links in the"Tracked Revisions" column of the table.
(All files in Adobe Acrobat PDF format)
(I) interim specification
Index for Standard Construction Specifications |
Number |
Date |
Tracked Revisions |
General | |||
Index for Comb Book | July 2020 | ||
Bidding Procedures | 90 | February 2019 | February 2019 to June 2020 |
Bidding Procedures | 90 | November 2018 | November 2018 to March 2019 |
Bidding Procedures | 90 | June 2017 | June 2017 to November 2018 |
Bidding Procedures | 90 |
May 2017 |
|
Bidding Procedures | 90 |
February 2017 |
|
General Conditions | 100(I) |
February 2017 to February 2019 | |
General Conditions | 100 |
||
Construction Order General Conditions | 110 |
||
Non Bonded General Conditions | 110(I) | February 2017 | |
Provisions For: | |||
Liquidated Damages | 130 |
||
Liquidated Damages | 130(I) |
||
Interim Payments | 140 |
||
Fuel Cost Adjustments | 160(I) | February 2017 | |
Fuel Cost Adjustments | 160 |
May 2012 |
|
Fuel Cost Adjustments | 160 |
||
Weigh Scales | 170 |
||
Field Laboratories | 180 |
March 2002 |
|
Traffic | |||
Traffic Control | 200(I) | November 2018 | November 2018 to February 2020 |
Traffic Control | 200 | February 2016 | February 2016 to November 2018 |
Traffic Control | 200 |
||
Culverts | |||
Jacking Culverts Through Embankments | 410 |
||
Grading | |||
Grading | 500 |
||
Grading | 500(I) | February 2017 | February 2017 to March 2018 |
Seeding | 540(I) |
||
Gravelling | |||
Stockpiling Aggregates | 600 |
||
Supplying and Depositing Aggregates | 610 |
||
Base Course | |||
Granular Base Course | 700 |
||
Pavement | |||
Bituminous Pavement and Recycled Bituminous Pavement | 800 |
March 2002 |
|
Bituminous Pavement and Recycled Bituminous Pavement | 800(I) | March 2018 - December 2018 | |
Bituminous Pavement and Recycled Bituminous Pavement | 800(I) | February 2017 | February 2017 to March 2018 |
Bituminous Pavement and Recycled Bituminous Pavement | 800(I) |
||
Bituminous Pavement and Recycled Bituminous Pavement | 800(I) |
December 2018 | December 2018 to August 2019 |
Construction Specification for Bituminous Pavement | 801(I) | March 2020 | |
Applying Prime Coat, Blotter Sand and Tack Coat | 805(I) | March 2018 | |
Applying Prime Coat, Blotter Sand and Tack Coat | 805 |
||
Applying Prime Coat, Blotter Sand and Tack Coat | 805(I) | February 2017 | February 2017 to March 2018 |
Concrete Pavement | 830 |
July 2003 |
|
Micro Surfacing Treatment | 827(I) | February 2020 | |
Micro Surfacing Treatment | 827(I) | January 2019 | January 2019 to February 2020 |
Concrete Pavement | 830(I) |
March 2015 - February 2017 | |
Concrete Curbing | 860(I) |
||
Aggregate | |||
For Portland Cement Concrete | 930 |
March 1986 |
|
For Granular Base Course | 900 |
||
For Traffic Gravel | 910 |
March 2002 |
|
For Bituminous Pavement | 920 |
January 2008 |
|
for Bituminous Pavement | 920 |
August 2015 |
|
For Seal Coat Cover | 940 |
January 2001 |
|
Excavation | |||
Structural Excavation | 1000(I) |
||
Demolition | |||
Demolition and Removal of Existing Concrete Structures | 1020 M |
||
Dismantling and Salvaging of Existing Structures | 1021 M |
||
Miscellaneous | |||
Approval, Supply and Application of Dust Control | 1280 | March 2011 | March 2011 to February 2019 |