Archived Standard Construction Specifications

Starting March 2013, Infrastructure began online archiving of previous versions of the standard construction specifications below. Previous versions of a given specification can be viewed by clicking the version date in the "Date" column of the table. A black line document showing all revisions between successive versions of a specification and can be opened by clicking the links in the"Tracked Revisions" column of the table.

(All files in Adobe Acrobat PDF format)
(I) interim specification

Index for Standard Construction Specifications
Number
Date
Tracked Revisions
General      
Index for Comb Book   July 2020
Bidding Procedures 90 February 2019 February 2019 to June 2020
Bidding Procedures 90 November 2018 November 2018 to March 2019
Bidding Procedures 90 June 2017 June 2017 to November 2018
Bidding Procedures
90
May 2017
Bidding Procedures
90
February 2017
General Conditions
100(I)
February 2017 to February 2019
General Conditions
100
 
Construction Order General Conditions
110
 
Non Bonded General Conditions 110(I) February 2017
Provisions For:      
Liquidated Damages
130
Liquidated Damages
130(I)
 
Interim Payments
140
 
Fuel Cost Adjustments 160(I) February 2017
Fuel Cost Adjustments
160
May 2012
Fuel Cost Adjustments
160
 
Weigh Scales
170
Field Laboratories
180
March 2002
Traffic
Traffic Control 200(I) November 2018 November 2018 to February 2020
Traffic Control 200 February 2016 February 2016 to November 2018
Traffic Control
200
Culverts      
Jacking Culverts Through Embankments
410
 
Grading      
Grading
500
 
Grading 500(I) February 2017 February 2017 to March 2018
Seeding
540(I)
Gravelling      
Stockpiling Aggregates
600
 
Supplying and Depositing Aggregates
610
 
Base Course      
Granular Base Course
700
 
Pavement      
Bituminous Pavement and Recycled Bituminous Pavement
800
March 2002
Bituminous Pavement and Recycled Bituminous Pavement 800(I)   March 2018 - December 2018
Bituminous Pavement and Recycled Bituminous Pavement 800(I) February 2017 February 2017 to March 2018
Bituminous Pavement and Recycled Bituminous Pavement
800(I)
 
Bituminous Pavement and Recycled Bituminous Pavement
800(I)
December 2018 December 2018 to August 2019
Construction Specification for Bituminous Pavement 801(I) March 2020
Applying Prime Coat, Blotter Sand and Tack Coat 805(I) March 2018
Applying Prime Coat, Blotter Sand and Tack Coat
805
 
Applying Prime Coat, Blotter Sand and Tack Coat 805(I) February 2017 February 2017 to March 2018
Concrete Pavement
830
July 2003
Micro Surfacing Treatment 827(I) February 2020  
Micro Surfacing Treatment 827(I) January 2019 January 2019 to February 2020
Concrete Pavement
830(I)
March 2015 - February 2017
Concrete Curbing
860(I)
Aggregate
For Portland Cement Concrete
930
March 1986
For Granular Base Course
900
For Traffic Gravel
910
March 2002
For Bituminous Pavement
920
January 2008
for Bituminous Pavement
920
August 2015
 
For Seal Coat Cover
940
January 2001
Excavation      
Structural Excavation
1000(I)
 
Demolition      
Demolition and Removal of Existing Concrete Structures
1020 M
 
Dismantling and Salvaging of Existing Structures
1021 M
 
Miscellaneous      
Approval, Supply and Application of Dust Control 1280 March 2011 March 2011 to February 2019