2016 Archived Bid Results

(Since January 14, 2016)


Bid Results Library

The following table contains the Bid Results and Tender Tabulations for all of Infrastructure's contracts for the construction and maintenance of roads, bridges, water control works and goods and services.

Bid Results are posted immediately after the Bid Submission Deadline and are unconfirmed results as read at the public tender opening.

Tender Tabulations are posted later and contain detailed bidding information that has been verified.


Tender/Contract
Number
Contract Description
Date of Public Opening
Bid Results (Unverified)
Tender Tabulations (Verified)
6718 Grade Widening (Includes Granular Base Shoulders) PTH 39 (21.5km East to 35.7km East of PR 392) December 20, 2016 6718 Results (PDF, 23 KB) 6718 (PDF, 30 KB)
6720 Bridge Construction (Structures) At Various Sites in SW Manitoba On PR 345 and 445 December 20, 2016 6720 Results (PDF, 23KB) 6720 (PDF, 31 KB)
6724 Channel Excavation Portage Diversion Vicinity of Oakland (North of PR 227 – Phase 3) (West of Low Flow Channel) December 20, 2016 6724 Results (PDF, 23 KB) 6724 (PDF, 31 KB)
6725 Construction of New Equipment Storage Shed and Office/Lunchroom MacGregor Maintenance Yard December 20, 2016 6725 Results (PDF, 23 KB) 6725 (PDF, 28 KB)
6723 Bituminous Pavement PTH 83 North of PR 482 TO 17.4km North December 15, 2016 6723 Results (PDF, 23 KB) 6723 (PDF, 23 KB)
6722 Grading (Curve Realignment) PTH 13 (1.6km N of PTH 3 - 4.8km N of PTH 3) December 15, 2016 6722 Results (PDF, 23 KB) 6722 (PDF, 23 KB)
6721 Channel Excavation Portage Diversion Vicinity of Oakland (North of PR 227 – Phase 2) (West of Low Flow Channel) December 15, 2016 6721 Results (PDF, 23 KB) 6721 (PDF, 34 KB)
6719 Stockpiling Aggregate Melita – Virden – Birtle – Russell Area December 15, 2016 6719 Results (PDF, 23 KB) 6719 (PDF, 25 KB)
6717 Channel Excavation Portage Diversion (Vicinity of Oakland) (North of PR 227 – East Side) December 13, 2016 6717 Results (PDF, 23 KB) 6717 (PDF, 39 KB)
6716 Reinforced Concrete Box Culvert Construction (Structure) in Hazelridge Drain on PTH 12 (North of Anola) December 8, 2016 6716 Results (PDF, 22KB) 6716 (PDF, 38 KB)
6715 Stockpiling Aggregate Minnedosa – Brandon Boissevain Area December 13, 2016 6715 Results (PDF, 22 KB) 6715 (PDF, 31 KB)
6714 Bituminous Pavement PR 251 PR 452 (Waskada) to PTH 21 December 1, 2016 6714 Results
(PDF, 22 KB)
6714 (PDF, 22 KB)
6711 Culvert Replacements (Jacking Steel Casing Culverts)
PTH 39 & PR 392
November 24, 2016 6711 Results
(PDF, 22 KB)
6711 (PDF, 27 KB)
6712 Shoo – Fly Detour (Structures) on PR 345 At Jackson Creek (1.6km West of East Jct PR 256) November 22, 2016 6712 Results
(PDF, 22 KB)
6712 (PDF, 22KB)
6713 Supply of Precast Prestressed Concrete Girders And Precast Concrete Panels For Various Bridges in SW Manitoba November 22, 2016 6713 Results
(PDF, 22 KB)
6713 (PDF, 22KB)
6707 Bituminous Pavement PR 204 0.7km North of PR 509 to 1.3km North November 1, 2016 6707 Results
(PDF, 20 KB)
6707 (PDF, 24 KB)
6708 Snyder Dam & Control Structures Dam Rehabilitation Municipality of Two Borders November 1, 2016 6708 Results
(PDF, 17 KB)
6708 (PDF, 77 KB)
6710 Construct and Deliver Seal Coat Bunk Trailers Portage La Prairie Maintenance Yard November 1, 2016 6710 Results
(PDF, 17 KB)
6710 (PDF, 30 KB)
6709 Supply of Precast Prestressed Concrete Girders For Bridge over Whiteshell River On PR 312 October 27, 2016 6709 Results
(PDF, 17 KB)
6709 (PDF, 30 KB)
6705 Culvert Installations PTH 12 (PR 435-PR 317) (Various Locations) October 18, 2016 6705 Results
(PDF, 22 KB)
6705 (PDF, 37 KB)
6706 Stockpiling Aggregate
Thompson - Wabowden Area
October 11, 2016 6706 Results
(PDF, 22 KB)
6706 (PDF, 24 KB)
6703 Stockpiling Aggregate Eriksdale – Ashern – Gypsumville Areas October 6, 2016 6703 Results
(PDF, 22 KB)
6703 (PDF, 20 KB)
6704 Bridge Construction (Structure) Over Plum River on PTH 75 (N/B) (At St. Jean Baptiste) October 6, 2016 6704 Results
(PDF, 22 KB)
6704 (PDF, 44 KB)
6702 Minnedosa Dam & Control Structures Spillway Stabilization Municipality of Minto September 27, 2016 6702 Results
(PDF, 22 KB)
6702 (PDF, 30 KB)
6701 Spillway Drainage Line "G" Repairs Shellmouth Dam September 15, 2016 6701 Results
(PDF, 22 KB)
6701 (PDF, 19 KB)
6699 Detour Construction Vicinity of PTH 11 (At Powerview Creek) September 13, 2016 6699 Results
(PDF, 22 KB)
6699 (PDF, 37 KB)
6700 Stockpiling Aggregate (EPP) Little Grand Rapids Airport September 13, 2016 6700 Results
(PDF, 22 KB)
6700 (PDF, 30 KB)
6697 Dam and Control Structures Safety Improvements and Bank Stabilization Wawanesa Dam September 8, 2016 6697 Results
(PDF, 22 KB)
6697 (PDF, 22 KB)
6698 Stockpiling Aggregate Dauphin - McCreary - Rorketon Area September 8, 2016 6698 Results
(PDF, 22 KB)
6698 (PDF, 22 KB)
6696 Stockpiling Aggregate Grandview – Roblin – Swan River – Pine River Area September 1, 2016 6696 Results
(PDF, 22 KB)
6696 (PDF, 21 KB)
6695 Drain Rehabilitation Tobacco Creek Vicinity of Kane August 30, 2016 6695 Results
(PDF, 22 KB)
6695 (PDF, 36 KB)
6693 Drainage Improvements Friedensthal Drain Vicinity of Dominion City (Phase 1) August 25, 2016 6693 Results
(PDF, 23 KB)
6693 (PDF, 31 KB)
6694 Construction of Equipment Storage Shed Water Control & Structures Yard Red River Yard Municipality of Springfield August 25, 2016 6694 Results
(PDF, 22 KB)
6694 (PDF, 30 KB)
6691 Construction of a New Weigh Station Office PTH 10 & PTH 2 August 23, 2016 6691 Results
(PDF, 22 KB)
6691 (PDF, 41 KB)
6692 Grading (Grade Widening) PTH 1 PTH 11 – PR 308 (W/B) August 23, 2016 6692 Results
(PDF, 23 KB)
6692 (PDF, 36 KB)
6689 Construct and Deliver Seal Coat Bunk Trailers Portage La Prairie Maintenance Yard August 18, 2016 6689 Results
(PDF, 22 KB)
 
6685 Bituminous Pavement PTH 1 Brokenhead River To GWWD Railway (E/B) August 17, 2016 6685 Results
(PDF, 22 KB)
6685 (PDF, 21 KB)
6688 Bituminous Pavement PTH 6 PR 248 to PR 415 (St. Laurent) August 16, 2016 6688 Results
(PDF, 22 KB)
6688 (PDF, 31 KB)
6683 Construction of Equipment Storage Shed Island Lake August 11, 2016 6683 Results
(PDF, 22 KB)
6683 (PDF, 30 KB)
6686 Gravity Outfall Rehabilitation Morris Ring Dike James Street Pump Station August 11, 2016 6686 Results
(PDF, 22 KB)
6686 (PDF, 19 KB)
6687 Spot Grade Improvements 127km E of PR 391 (Split Lake Access Rd) -- 178km E of PR 391 (Keeyask Jct) August 11, 2016 6687 Results
(PDF, 22 KB)
6687 (PDF, 33 KB)
6681 Dike Stabilization and Pump Station Rehabilitation St. Pierre-Jolys Ring Dike August 9, 2016 6681 Results
(PDF, 22 KB)
6681 (PDF, 31 KB)
6684 Concrete Rehabilitation
PTH 101
(PTH 1E to PTH 59N)
August 4, 2016 6684 Results
(PDF, 17 KB)
6684 (PDF, 23 KB)
6682 Supply of Structural Steel Plate Girders (Structure) For a Bridge Over Plum River On PTH 75 (N/B) (At St. Jean Baptiste) July 28, 2016 6682 Results
(PDF, 22 KB)
6682 (PDF, 19 KB)
6680 Spot Road Improvements PR 513 East of PTH 6 – Dauphin River First Nation (Various Locations) July 14, 2016 6680 Results
(PDF, 22 KB)
6680 (PDF, 21 KB)
6679 Installation of Underground Traffic Signal Plant and Pedestrian Corridor Various Locations Throughout Manitoba July 21, 2016 6679 Results
(PDF, 19 KB)
6679 (PDF, 36 KB)
6678 Bituminous Pavement (Mill & Thin Lift Overlay) PTH 101 – PTH 100 – PTH 1E Various Locations July 12, 2016 6678 Results
(PDF, 23 KB)
6678 (PDF, 19 KB)
6677 Construction of Equipment Storage Shed Lorette Maintenance Yard July 7, 2016 6677 Results
(PDF, 22 KB)
6677 (PDF, 28 KB)
6675 Grading For Bridge Construction PTH 1W W/B Over Assiniboine River (East of Portage la Prairie) June 30, 2016 6675 Results
(PDF, 22 KB)
6675 (PDF, 30 KB)
6676 Stockpiling Aggregate The Pas – Cranberry Portage Snow Lake – Grand Rapids Area June 30, 2016 6676 Results
(PDF, 22 KB)
6676 (PDF, 16 KB)
6673 Bituminous Pavement (Structures) Shell, Drifting and Fork River PTH 5, 10 and PTH 20 June 14, 2016 6673 Results
(PDF, 17 KB)
6673 (PDF, 31 KB)
6671 Bituminous Pavement PTH 1 At Gaol Road June 2, 2016 6671 Results
(PDF, 22 KB)
6671 (PDF, 31 KB)
6669 Grading PTH 14 0.8km East of PR 306 to 2.8km East of PR 306 May 17, 2016 6669 Results
(PDF, 22 KB)
6669 (PDF, 38 KB)
6672 Culvert Installation (Culvert Jacking) Drain Rehabilitation – Railway Crossing At Portage La Prairie May 17, 2016 6672 Results
(PDF, 22 KB)
6672 (PDF, 27 KB)
6670 Construction of Equipment Storage Shed & Office Building Stony Mountain Maintenance Yard May 10, 2016 6670 Results
(PDF, 17 KB)
6670 (PDF, 21 KB)
6668 Supply of Structural Steel Plate Girders (Structure) For a Bridge Over the Winnipeg River On PR 313 Vicinity of Lac Du Bonnet April 19, 2016 6668 Results
(PDF, 17 KB)
6668 (PDF, 19 KB)
6667 Dust Control Swan River – Dauphin – Ashern Areas April 12, 2016 6667 Results
(PDF, 17 KB)
6667 (PDF, 18 KB)
6666 Bridge Construction (Structure) Over Whitemouth River On PTH 1E (EB) (Vicinity of Prawda) April 8, 2016 6666 Results
(PDF, 16 KB)
6666 (PDF, 35 KB)
6662 Dust Control South Western Region (Various Locations) April 7, 2016 6662 Results
(PDF, 12 KB)
6662 (PDF, 18 KB)
6660 Dust Control South Central Region (Various Locations in the Southern Half) April 5, 2016 6660 Results
(PDF, 12 KB)
6660 (PDF, 18 KB)
6659 Dust Control South Central Region (Various Locations in the Northern Half) March 31, 2016 6659 Results
(PDF, 12 KB)
6659 (PDF, 18 KB)
6663 Bituminous Pavement (Includes Grade Widening & Base) PTH 10 4.5km North of PTH 24 – PTH 16 (Including Passing Lanes) March 31, 2016 6663 Results
(PDF, 13 KB)
6663 (PDF, 18 KB)
6664 Depositing and Stockpiling Traffic Gravel Manitou – Sperling Area March 31, 2016 6664 Results
(PDF, 12 KB)
6664 (PDF, 18 KB)
6665 Micro-Surfacing Treatment (Eastern Region - East) PTH 1, 11, 12, 44 PR 313, 317, 502 and PR 601 Falcon Lake - Pinawa - Steinbach - Beausejour - Lac Du Bonnet Area March 31, 2016 6665 Results
(PDF, 13 KB)
6665 (PDF, 18 KB)
6658 Dust Control Region 1 North Eastern March 29, 2016 6658 Results
(PDF, 12 KB)
6658 (PDF, 18 KB)
6661 Depositing and Stockpiling Traffic Gravel
Gimli - Arborg - Pine Dock Area
March 29, 2016 6661 Results
(PDF, 12 KB)
6661 (PDF, 18 KB)
6651 Construction of Equipment Storage Shed and Office/ Lunchroom Building Minnedosa Maintenance Yard March 24, 2016 6651 Results
(PDF, 13 KB)
6651 (PDF, 19 KB)
6656 Dust Control Region 1 South Eastern March 24, 2016 6656 Results
(PDF, 13 KB)
6656 (PDF, 18 KB)
6657 Supply of Structural Steel Plate Girders (Structure) For a Bridge at Eden Lake On PR 391 March 24, 2016 6657 Results
(PDF, 13 KB)
6657 (PDF, 18 KB)
6655 Dust Control Northern Region (South of Thompson) March 22, 2016 6655 Results
(PDF, 12 KB)
6655 (PDF, 18 KB)
6649 Bridge Construction (Structures) Over Grassmere Creek Drain On Summit Road March 17, 2016 6649 Results
(PDF, 12 KB)
6649 (PDF, 25 KB)
6653 Dust Control PR 391 Thompson Northerly To Lynn Lake March 17, 2016 6653 Results
(PDF, 12 KB)
6653 (PDF, 18 KB)
6654 Micro-Surfacing Treatment (West Central - Northern) PTH 5, 6, 10, 50 PR 267, 325, 373 and PR 601 Ochre River - Grand Rapids - Ashville Silver Ridge - Sifton - Ashern - Wabowden Alonsa Area March 17, 2016 6654 Results
(PDF, 13 KB)
6654 (PDF, 27 KB)
6650 Dust Control PR 280 & PR 290 Thompson -- Gilliam Area March 15, 2016 6650 Results
(PDF, 12 KB)
6650 (PDF, 18 KB)
6646 Bituminous Pavement PTH 5 PR 366 to 4.0km East of PR 583 March 10, 2016 6646 Results
(PDF, 18 KB)
6646 (PDF, 16 KB)
6648 Depositing and Stockpiling Aggregate Arden – Oakville Area March 10, 2016 6648 Results
(PDF, 17 KB)
6648 (PDF, 16 KB)
6647 Construction of Equipment Storage Shed and Office/Lunchroom Building Roblin Maintenance Yard March 3, 2016 6647 Results
(PDF, 18 KB)
6647 (PDF, 18 KB)
6645 Micro-Surfacing Treatment (South Central - South Western) PTH 1,3,5,10,14,16,21,32,34 and PTH 83 Virden - Morden - Carberry Winkler - Minnedosa - Deloraine Crystal City - Pipestone Area March 1, 2016 6645 Results
(PDF, 20 KB)
6645 (PDF, 33 KB)
6643 Grading (Includes Base) PR 280 Km 85 to Km 95 March 1, 2016 6643 Results
(PDF, 18 KB)
6643 (PDF, 25 KB)
6644 Supply of Prestressed Concrete Girders (Structures) For A Bridge Over Grassmere Drain On Summit Road February 25, 2016 6644 Results
(PDF, 17 KB)
6644 (PDF, 18 KB)
6642 Construction of Equipment Storage Shed Grand Rapids Maintenance Yard February 18, 2016 6642 Results
(PDF, 17 KB)
6642 (PDF, 15 KB)
6641 Supplying and Depositing Traffic Gravel Sanford – Teulon Area February 18, 2016 6641 Results
(PDF, 17 KB)
6641 (PDF, 27 KB)
6640 Application of Pavement Marking Paint Various Locations Province of Manitoba February 18, 2016 6640 Results
(PDF, 18 KB)
6640 (PDF, 27 KB)
6638 Bituminous Pavement (Includes Base) PTH 10 Flin Flon Airport Access To East Junction of PTH 10A February 16, 2016 6638 Results
(PDF, 13 KB)
6638 (PDF, 20 KB)
6639 Rockfill Column Installation and PDA Testing (Slope Stabilization Structure) At Plum River Bridge on PTH 75 (Vicinity of St. Jean-Baptiste) February 9, 2016 6639 Results
(PDF, 12 KB)
6639 (PDF, 22 KB)
6636 Bridge Construction (Structures) Over Spruce Creek(Maple Creek) On Municipal Road 142N February 9, 2016 6636 Results
(PDF, 12 KB)
6636 (PDF, 27 KB)
6637 Fairford Dam & Control Structures Safety Improvements R.M. of Grahamdale (Phase 1 – Operation Platform) February 4, 2016 6637 Results
(PDF, 18 KB)
6637 (PDF, 22 KB)
6635 Supply of Structural Steel Plate Girders(Structures) On PTH 1E Over Whitemouth River (Vicinity of Prawda) February 4, 2016 6635 Results
(PDF, 17 KB)
6635 (PDF, 20 KB)
6634 Channel Excavation Portage Diversion Vicinity of Oakland (North of PR 227 – East Dike) Phase 2 January 28, 2016 6634 Results
(PDF, 13 KB)
6634 (PDF, 20 KB)
6633 Bridge Construction (Structures) At Various Sites in SW Manitoba On PR 256, 445 and 252 January 21, 2016 6633 Results
(PDF, 18 KB)
6633 (PDF, 21 KB)
6632 Stockpiling Traffic Gravel Manigotagan Area January 21, 2016 6632 Results
(PDF, 17 KB)

6632 (PDF, 23 KB)

6629 Bridge Construction (Structures) Over Antler River and Gopher Creek On PTH 83 January 14, 2016 6629 Results
(PDF, 13 KB)
6629 (PDF, 20 KB)